Proposed Phasing & Timing

Phase 1

Create a committee to begin the Preliminary Investigation Stage

Phase 2

If enough interest, the committee will meet with the MD for preliminary numbers

Phase 3

Move into formal process for Local Improvement Petition Request

How much does it cost?

Once the MD receives and accepts a petition from landowners, the MD will obtain a final engineering estimate. This amount will include a connection fee of $15,000 per unit to FCR. This is a 50% reduction from the regular $30.000 fee. This reduced fee is available for the initial offering only.

Note: The MD will then advise all signatories to the petition of the cost of connections. All signatories then have the option of accepting the amount and proceeding with connection.